Volume Test Success depends on

  • Utilising a restricted time span to best effect
  • Staying focused on the objectives
  • Building a large enough Volume Test so that the results are valid
  • Being selective in the functionality to be included in the automated workload so as to limit the build phase to fit the available time
  • Making maximum use of the Volume Test environment once built

Confirm Method and Objectives

Database Creation/Expansion

Transaction Script Creation

Assembling the Transaction Test Data

Build and Run Initial Volume Tests

Modify, then Run Test Variants

User-involved Tests

Data Analysis and Results

Is it really this easy? Can we possibly be as good as we say we are? Even some of our customers were initially sceptical of our claims. There may be no substitute for seeing us in action, but for more details about how we go about things, you may read the rationale behind the design of our methodology and software, look at the web interface to our Volume Testing Work-bench, read the specimen report (an anonymised account of a recent exercise, most browsers will open this automatically), or study our Project Planning Template.

As to why you might want to Volume Test, consider these Before and After results from recent testing. Without a Volume Test, the Before could have been the First Hour of Live Running ...

E2 Systems Limited +44 7798 728 236

** Suppliers please email. Use of this phone number will negate all possibilities **